Project Info
View and download important project documents, budgets, and materials
Construction Stages & Budget
PHASE ONE
775,000Ground work preparations and pillar foundations
PHASE TWO
785,000Main Bridge Frame and Decking
PHASE THREE
525,000Handrails, Painting, Marrum and security fencing
COMPLETION
265,000Administration, Approvals, Opening day Ceremonies
Total Project Costing
2,315,000Bridge Design & Specifications

Professional bridge design concept
Durable Materials
High-quality steel and concrete construction designed to last decades, ensuring the bridge withstands weather conditions and heavy usage.
Safe Design
Proper railings, non-slip surfaces, and adequate width for safe passage ensure the safety of all community members crossing the bridge.
Community Input
Designed with community feedback to meet local needs and preferences, ensuring the bridge serves its purpose effectively.
Project Location
Zion Valley Nature Park Area
The bridge will be strategically located to connect the Mathari and Kamakwa communities, providing direct access to schools, healthcare facilities. Access to the Matatu point, the community meeting point and the Zion Valley Nature center.

Aerial view showing strategic bridge location