    We Can Build Our Bridge Together

    Project Info

    View and download important project documents, budgets, and materials

    Construction Stages & Budget

    PHASE ONE

    775,000

    Ground work preparations and pillar foundations

    PHASE TWO

    785,000

    Main Bridge Frame and Decking

    PHASE THREE

    525,000

    Handrails, Painting, Marrum and security fencing

    COMPLETION

    265,000

    Administration, Approvals, Opening day Ceremonies

    Total Project Costing

    2,315,000

    Bridge Design & Specifications

    Professional bridge design concept

    Professional bridge design concept

    Durable Materials

    High-quality steel and concrete construction designed to last decades, ensuring the bridge withstands weather conditions and heavy usage.

    Safe Design

    Proper railings, non-slip surfaces, and adequate width for safe passage ensure the safety of all community members crossing the bridge.

    Community Input

    Designed with community feedback to meet local needs and preferences, ensuring the bridge serves its purpose effectively.

    Project Location

    Zion Valley Nature Park Area

    The bridge will be strategically located to connect the Mathari and Kamakwa communities, providing direct access to schools, healthcare facilities. Access to the Matatu point, the community meeting point and the Zion Valley Nature center.

    Serving over 2,000 community members
    Year-round accessibility needed
    Aerial view showing bridge location

    Aerial view showing strategic bridge location